Back in 1999, when the ZBD-04 entered trial service with the armed forces (at the time speculatively referred to by outside observers as the "ZBD-97"), the PLA Navy Marine Corps expressed great interest in the platform. Prototype No. 01 was swiftly assigned to the Marines for field testing. However, the evaluation revealed that the ZBD-04's swimming capability and amphibious speed fell short of requirements, and the proposal to add external flotation pontoons was ultimately rejected. In 2000, the ZBD-04-based amphibious program was canceled, leading to a new dedicated project to design a custom amphibious armored vehicle specifically for the Marine Corps—which became the ZBD-05.